73 lines
50 KiB
JSON
73 lines
50 KiB
JSON
{"at":"2026-09-01 00:53:36","draft_path":"documents/requirements-draft-v1-0ab82f5d031b-cad_b74e9539b3f7_inv_3a9e6a02424.json","draft_revision":1,"event":"requirements_draft_updated","invocation_id":"cad_b74e9539b3f7_inv_3a9e6a02424003f7","item_count":1,"schema_version":"cad.action-ledger.v1","sequence":1}
|
|
{"at":"2026-09-01 00:53:39","draft_revision":1,"event":"requirements_review_requested","invocation_id":"cad_b74e9539b3f7_inv_f20b01483ee6e8d4","schema_version":"cad.action-ledger.v1","sequence":2}
|
|
{"at":"2026-09-01 00:53:44","event":"requirements_evaluation_oracle_revise","invocation_id":"cad_b74e9539b3f7_inv_692068fb0e0ea2e2","missing_claims":[{"claim_kind":"solid_count_equals","expected":{"value":1}},{"claim_kind":"bbox_rank_dimension_mm","expected":{"rank":"minimum","value":10}},{"claim_kind":"through_cylindrical_bore","expected":{"count":3,"diameter_mm":12}}],"oracle_path":"documents/evaluation-contract-oracle-509786c2ba1e.json","review_path":"documents/requirements-review-95c3c7c2c161-cad_b74e9539b3f7_inv_692068fb0e0.json","schema_version":"cad.action-ledger.v1","sequence":3}
|
|
{"at":"2026-09-01 00:53:54","draft_path":"documents/requirements-draft-v2-5086dd441040-cad_b74e9539b3f7_inv_da67e9f8638.json","draft_revision":2,"event":"requirements_draft_patched","invocation_id":"cad_b74e9539b3f7_inv_da67e9f86383a76e","item_count":1,"schema_version":"cad.action-ledger.v1","sequence":4}
|
|
{"at":"2026-09-01 00:53:58","draft_revision":2,"event":"requirements_review_requested","invocation_id":"cad_b74e9539b3f7_inv_e832feda86e60be4","schema_version":"cad.action-ledger.v1","sequence":5}
|
|
{"at":"2026-09-01 00:54:03","contract_hash":"0cc1d6d015eb503943e6731f03f8eba1516cbeaec90c49f0a98c02f9badfd3ab","contract_path":"documents/requirements-contract-26de43941354-cad_b74e9539b3f7_inv_1d96010c3cc.json","event":"requirements_contract_frozen","invocation_id":"cad_b74e9539b3f7_inv_1d96010c3ccf486d","requirement_count":1,"review_path":"documents/requirements-review-95c3c7c2c161-cad_b74e9539b3f7_inv_1d96010c3cc.json","schema_version":"cad.action-ledger.v1","sequence":6}
|
|
{"action_id":"act_007","at":"2026-09-01 00:54:11","atomic_id":"extrude_add_blind","contract_hash":"fa9ffc9fd2141453fa18a389813dde2e2ef3fb4c7ef5d05e61d51d614309e95f","event":"proposed","expected_change":"Add a 10 mm thick solid link body whose 2D profile follows three 32 mm diameter end lobes smoothly connected along the collinear hole centers at 0, 60, and 140 mm, with three 12 mm through holes centered on that chain.","intent":"Create the base mechanical link solid in one operation so the specified bore chain and outer contour can be validated against the requirement.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":7,"working_head":"cad_b74e9539b3f7:root:v6"}
|
|
{"at":"2026-09-01 00:54:33","code":"RUNTIME_PRECONDITION_FAILED","event":"runtime_precondition_rejected","message":"RUNTIME_PRECONDITION_FAILED: materialized fragment is not executable by the engine: CDSL engine runtime preflight failed: feature feature_001: profile_resolution_failed","schema_version":"cad.action-ledger.v1","sequence":8,"tool":"submit_cdsl_fragment"}
|
|
{"action_id":"act_009","at":"2026-09-01 00:54:41","atomic_id":"extrude_add_blind","contract_hash":"fa9ffc9fd2141453fa18a389813dde2e2ef3fb4c7ef5d05e61d51d614309e95f","event":"proposed","expected_change":"Add a 10 mm thick link body using an executable closed 2D profile centered on three collinear 12 mm hole locations at 0, 60, and 140 mm, with smooth outer transitions between three 32 mm end lobes.","intent":"Resolve the profile preflight failure by restating the base solid as a single valid blind extrusion that satisfies the three-hole link geometry.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":9,"working_head":"cad_b74e9539b3f7:root:v8"}
|
|
{"action_id":"act_009","at":"2026-09-01 00:55:00","candidate_id":"candidate_f7b19888e6c75afd","event":"candidate_building","fragment_hash":"18c3fe5763650f67792894048628bbbeac03f0f277127e050a5dafb86711b282","schema_version":"cad.action-ledger.v1","sequence":10,"stage_id":"stage_f7b19888e6c75afd932d"}
|
|
{"action_id":"act_009","at":"2026-09-01 00:55:02","candidate_id":"candidate_f7b19888e6c75afd","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"actual":2,"expected":1},"status":"fail"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_rejected","reason":"deterministic_claim_failed","schema_version":"cad.action-ledger.v1","sequence":11,"stage_id":"stage_f7b19888e6c75afd932d","working_head":"cad_b74e9539b3f7:root:v8"}
|
|
{"at":"2026-09-01 00:55:12","corrective_intent":"Reduce the candidate to one connected body by removing the extra disconnected solid while preserving the intended 10 mm link geometry.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_ledger_11"],"root_cause":"The current candidate materializes as two separate solids instead of one connected body, which directly violates the deterministic solid-count invariant and indicates the base profile/extrusion created an unintended disconnected fragment.","schema_version":"cad.action-ledger.v1","sequence":12,"working_head":"cad_b74e9539b3f7:root:v12","working_head_before":"cad_b74e9539b3f7:root:v11"}
|
|
{"action_id":"act_013","at":"2026-09-01 00:55:21","atomic_id":"extrude_add_blind","contract_hash":"fa9ffc9fd2141453fa18a389813dde2e2ef3fb4c7ef5d05e61d51d614309e95f","event":"proposed","expected_change":"Create a single connected 10 mm thick link body from one closed 2D profile that spans the three collinear hole centers at 0, 60, and 140 mm, with three 32 mm outer lobes blended smoothly into one outline and no disconnected fragment.","intent":"Repair the rejected geometry by rebuilding the base solid as one executable blind extrusion that preserves the intended three-hole mechanical link and satisfies the single-body invariant.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":13,"working_head":"cad_b74e9539b3f7:root:v12"}
|
|
{"action_id":"act_013","at":"2026-09-01 00:55:41","candidate_id":"candidate_ec68a01b9ab76228","event":"candidate_building","fragment_hash":"1d59215421bfd1a481e9b228a77f04038ca577fb7753e0011def4946da73423f","schema_version":"cad.action-ledger.v1","sequence":14,"stage_id":"stage_ec68a01b9ab76228a753"}
|
|
{"action_id":"act_013","at":"2026-09-01 00:55:42","candidate_id":"candidate_ec68a01b9ab76228","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"actual":4,"expected":1},"status":"fail"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_rejected","reason":"deterministic_claim_failed","schema_version":"cad.action-ledger.v1","sequence":15,"stage_id":"stage_ec68a01b9ab76228a753","working_head":"cad_b74e9539b3f7:root:v12"}
|
|
{"at":"2026-09-01 00:55:53","corrective_intent":"Rebuild the geometry as one connected 10 mm thick body before rechecking the deterministic claims.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_ledger_15"],"root_cause":"The candidate still splits into four solids, so it violates the deterministic single-body invariant and cannot satisfy the requested link geometry as built.","schema_version":"cad.action-ledger.v1","sequence":16,"working_head":"cad_b74e9539b3f7:root:v16","working_head_before":"cad_b74e9539b3f7:root:v15"}
|
|
{"action_id":"act_017","at":"2026-09-01 00:56:00","atomic_id":"extrude_add_blind","contract_hash":"fa9ffc9fd2141453fa18a389813dde2e2ef3fb4c7ef5d05e61d51d614309e95f","event":"proposed","expected_change":"Build one closed 2D profile for a single 10 mm thick connected link body with three 12 mm through-hole positions at 0, 60, and 140 mm, using 32 mm outer lobes joined by smooth tangent transitions so the result is one solid.","intent":"Repair the rejected geometry by re-establishing a single executable base body before any bore validation, matching the three-hole mechanical link requirement.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":17,"working_head":"cad_b74e9539b3f7:root:v16"}
|
|
{"action_id":"act_017","at":"2026-09-01 00:56:22","candidate_id":"candidate_8f02b86b135dd854","event":"candidate_building","fragment_hash":"41dffcbcfafdb54a9628f80e31f937995d714d39e977fcdfd3b5f1eec73c9ef3","schema_version":"cad.action-ledger.v1","sequence":18,"stage_id":"stage_8f02b86b135dd854f3b5"}
|
|
{"action_id":"act_017","at":"2026-09-01 00:56:22","candidate_id":"candidate_8f02b86b135dd854","event":"candidate_build_failed","message":"CANDIDATE_BUILD_FAILED: GC_MakeArcOfCircle::Value() - no result","schema_version":"cad.action-ledger.v1","sequence":19,"stage_id":"stage_8f02b86b135dd854f3b5","working_head":"cad_b74e9539b3f7:root:v16"}
|
|
{"at":"2026-09-01 00:56:30","corrective_intent":"Accept the build failure, keep the checkpoint unchanged, and return to action selection with a simpler connected profile construction.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_ledger_19"],"root_cause":"The candidate failed during arc creation, so the repaired geometry was never instantiated and the current checkpoint remains unchanged.","schema_version":"cad.action-ledger.v1","sequence":20,"working_head":"cad_b74e9539b3f7:root:v20","working_head_before":"cad_b74e9539b3f7:root:v19"}
|
|
{"action_id":"act_021","at":"2026-09-01 00:56:37","atomic_id":"extrude_add_blind","contract_hash":"fa9ffc9fd2141453fa18a389813dde2e2ef3fb4c7ef5d05e61d51d614309e95f","event":"proposed","expected_change":"Create one connected 2D profile extruded to 10 mm with three 12 mm through-hole positions centered on a straight axis at 0, 60, and 140 mm, and a smooth outer silhouette formed by three 32 mm diameter lobes joined tangentially.","intent":"Rebuild the link as a single solid with the required three collinear holes and smooth 32 mm outer ends, avoiding the previous disconnected-body failure.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":21,"working_head":"cad_b74e9539b3f7:root:v20"}
|
|
{"at":"2026-09-01 00:56:55","code":"RUNTIME_PRECONDITION_FAILED","event":"runtime_precondition_rejected","message":"RUNTIME_PRECONDITION_FAILED: materialized fragment is not executable by the engine: CDSL engine runtime preflight failed: feature feature_001: profile_resolution_failed","schema_version":"cad.action-ledger.v1","sequence":22,"tool":"submit_cdsl_fragment"}
|
|
{"action_id":"act_023","at":"2026-09-01 00:57:08","atomic_id":"extrude_add_blind","contract_hash":"fa9ffc9fd2141453fa18a389813dde2e2ef3fb4c7ef5d05e61d51d614309e95f","event":"proposed","expected_change":"Materialize a single connected profile extruded to 10 mm with three 12 mm through holes at 0, 60, and 140 mm on one centerline, and a smooth outer contour built from three 32 mm lobes.","intent":"Retry the link as one connected solid after the profile resolution failure, keeping the geometry aligned to the specified collinear hole chain and 32 mm end lobes.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":23,"working_head":"cad_b74e9539b3f7:root:v22"}
|
|
{"at":"2026-09-01 00:57:26","code":"RUNTIME_PRECONDITION_FAILED","event":"runtime_precondition_rejected","message":"RUNTIME_PRECONDITION_FAILED: materialized fragment is not executable by the engine: CDSL engine runtime preflight failed: feature feature_001: profile_resolution_failed","schema_version":"cad.action-ledger.v1","sequence":24,"tool":"submit_cdsl_fragment"}
|
|
{"action_id":"act_025","at":"2026-09-01 00:57:34","atomic_id":"extrude_add_blind","contract_hash":"fa9ffc9fd2141453fa18a389813dde2e2ef3fb4c7ef5d05e61d51d614309e95f","event":"proposed","expected_change":"Create one connected 2D profile extruded to 10 mm with three 12 mm through-hole positions centered on a straight axis at 0, 60, and 140 mm, and a smooth outer silhouette formed by three 32 mm diameter lobes joined tangentially.","intent":"Retry the link as one connected solid after the profile resolution failure, keeping the geometry aligned to the specified collinear hole chain and 32 mm end lobes.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":25,"working_head":"cad_b74e9539b3f7:root:v24"}
|
|
{"action_id":"act_025","at":"2026-09-01 00:57:53","candidate_id":"candidate_8d43c15b58e3fecb","event":"candidate_building","fragment_hash":"9159a3c5abbc200929f1965a575f0ee7b156049825c6933a2022ef0d52cd2894","schema_version":"cad.action-ledger.v1","sequence":26,"stage_id":"stage_8d43c15b58e3fecb7e27"}
|
|
{"action_id":"act_025","at":"2026-09-01 00:57:53","candidate_id":"candidate_8d43c15b58e3fecb","event":"candidate_build_failed","message":"CANDIDATE_BUILD_FAILED: GC_MakeArcOfCircle::Value() - no result","schema_version":"cad.action-ledger.v1","sequence":27,"stage_id":"stage_8d43c15b58e3fecb7e27","working_head":"cad_b74e9539b3f7:root:v24"}
|
|
{"at":"2026-09-01 00:58:04","corrective_intent":"Stop this candidate and select a different action path that avoids the invalid arc/profile construction.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_ledger_27","evidence_ledger_15","evidence_ledger_19"],"root_cause":"The candidate failed during arc construction and profile resolution, so the connected outer profile could not be materialized into an executable solid.","schema_version":"cad.action-ledger.v1","sequence":28,"working_head":"cad_b74e9539b3f7:root:v28","working_head_before":"cad_b74e9539b3f7:root:v27"}
|
|
{"action_id":"act_029","at":"2026-09-01 00:58:14","atomic_id":"extrude_add_blind","contract_hash":"fa9ffc9fd2141453fa18a389813dde2e2ef3fb4c7ef5d05e61d51d614309e95f","event":"proposed","expected_change":"Build a single connected solid by extruding a new 2D outer profile to 10 mm, using three 32 mm diameter lobes centered on the collinear hole chain and straight tangential transitions to avoid arc-resolution failure, while preserving the three 12 mm through-hole locations at 0, 60, and 140 mm.","intent":"Record the geometry conclusion and retry with a simpler profile construction path that avoids the invalid arc candidate while still matching the required three-hole mechanical link.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":29,"working_head":"cad_b74e9539b3f7:root:v28"}
|
|
{"action_id":"act_029","at":"2026-09-01 00:59:33","candidate_id":"candidate_f75848e1ea229d67","event":"candidate_building","fragment_hash":"5da21e70533b3636eeef651b4032b45a05d24b40ce92ec97b1fd43574fa1157d","schema_version":"cad.action-ledger.v1","sequence":30,"stage_id":"stage_f75848e1ea229d679996"}
|
|
{"action_id":"act_029","at":"2026-09-01 00:59:34","candidate_id":"candidate_f75848e1ea229d67","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"solid_count":1},"status":"pass"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_built","schema_version":"cad.action-ledger.v1","sequence":31}
|
|
{"action_id":"act_029","actual_atomic_id":"extrude_add_blind","at":"2026-09-01 00:59:46","candidate_id":"candidate_f75848e1ea229d67","coverage":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"solid_count":1},"status":"pass"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"accepted","fragment_hash":"5da21e70533b3636eeef651b4032b45a05d24b40ce92ec97b1fd43574fa1157d","parent_revision":"","review_path":"revisions/rev_001/candidate-review.json","revision_id":"rev_001","schema_version":"cad.action-ledger.v1","selector_snapshot_id":"","sequence":32,"working_head_before":"cad_b74e9539b3f7:root:v28"}
|
|
{"action_id":"act_033","at":"2026-09-01 00:59:58","atomic_id":"hole_wizard","contract_hash":"35d56dd42ee933e0fe59f9cfc33391b25844bd270a8909703af7855ad6bd25f2","event":"proposed","expected_change":"Introduce a 12 mm through hole at the first center on the existing collinear axis, using the 10 mm thick body as the cut depth reference so the bore fully penetrates the part.","intent":"Begin the required three-hole chain by creating the first deterministic through bore before placing the remaining two at the specified spacings.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":33,"working_head":"cad_b74e9539b3f7:rev_001:v32"}
|
|
{"action_id":"act_033","at":"2026-09-01 01:01:37","candidate_id":"candidate_01843c3940e4b0f2","event":"candidate_building","fragment_hash":"b4495bb092e870190a2005eda495310f899e3fe2573c0eb5efcf92707ded58a0","schema_version":"cad.action-ledger.v1","sequence":34,"stage_id":"stage_01843c3940e4b0f28b5d"}
|
|
{"action_id":"act_033","at":"2026-09-01 01:01:39","candidate_id":"candidate_01843c3940e4b0f2","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"actual":2,"expected":1},"status":"fail"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.000000000000178,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_rejected","reason":"deterministic_claim_failed","schema_version":"cad.action-ledger.v1","sequence":35,"stage_id":"stage_01843c3940e4b0f28b5d","working_head":"cad_b74e9539b3f7:rev_001:v32"}
|
|
{"at":"2026-09-01 01:01:55","corrective_intent":"Resume at action selection and re-evaluate the pending action under the opaque selector requirement before requesting any rollback.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_current_model","evidence_current_claims","evidence_ledger_35"],"root_cause":"The previous response attempted a rollback path while the state error explicitly requires returning to action selection first; the pending action must be reselected before any rollback request.","schema_version":"cad.action-ledger.v1","sequence":36,"working_head":"cad_b74e9539b3f7:rev_001:v36","working_head_before":"cad_b74e9539b3f7:rev_001:v35"}
|
|
{"action_id":"act_037","at":"2026-09-01 01:02:07","atomic_id":"hole_wizard","contract_hash":"35d56dd42ee933e0fe59f9cfc33391b25844bd270a8909703af7855ad6bd25f2","event":"proposed","expected_change":"Introduce the first 12 mm through bore on the collinear centerline of the existing three-lobe link, using the current 10 mm thickness as the through depth so the cut fully penetrates the solid.","intent":"Advance the pending bore chain by placing the first deterministic hole while preserving the existing outer profile geometry.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":37,"working_head":"cad_b74e9539b3f7:rev_001:v36"}
|
|
{"action_id":"act_037","at":"2026-09-01 01:02:39","candidate_id":"candidate_d2c56a744271e912","event":"candidate_building","fragment_hash":"b2f848f94ee299c6c66e41f3b6df3ae04e7ec8a0ad0ea4630f50388fb52d90d3","schema_version":"cad.action-ledger.v1","sequence":38,"stage_id":"stage_d2c56a744271e9124072"}
|
|
{"action_id":"act_037","at":"2026-09-01 01:02:41","candidate_id":"candidate_d2c56a744271e912","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"actual":2,"expected":1},"status":"fail"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.00000000000015,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_rejected","reason":"deterministic_claim_failed","schema_version":"cad.action-ledger.v1","sequence":39,"stage_id":"stage_d2c56a744271e9124072","working_head":"cad_b74e9539b3f7:rev_001:v36"}
|
|
{"at":"2026-09-01 01:02:50","corrective_intent":"Re-evaluate the pending bore action because it produced a second solid instead of a single through-bore.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_current_model","evidence_current_claims","evidence_ledger_39"],"root_cause":"The attempted hole insertion violated the single-solid invariant by splitting the model into two solids, so the action cannot be accepted as-is.","schema_version":"cad.action-ledger.v1","sequence":40,"working_head":"cad_b74e9539b3f7:rev_001:v40","working_head_before":"cad_b74e9539b3f7:rev_001:v39"}
|
|
{"action_id":"act_041","at":"2026-09-01 01:03:03","atomic_id":"hole_blind","contract_hash":"f62e12603feeca6d7e83acdab651fcb023e08a46c39fd1509e9dcb81d4f0c721","event":"proposed","expected_change":"Add one 12 mm through-hole at the next collinear center position in the existing one-solid link body, using a 10 mm cut depth so the bore fully penetrates without splitting the body into multiple solids.","intent":"Repair the pending bore chain by introducing a single deterministic through bore while preserving the single-solid invariant.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":41,"working_head":"cad_b74e9539b3f7:rev_001:v40"}
|
|
{"action_id":"act_041","at":"2026-09-01 01:03:30","candidate_id":"candidate_7cd35c1437cb0bb4","event":"candidate_building","fragment_hash":"08c365e8152ceff36769b31da2ac778722b46ac5336dcd61bc8e35c6fce440fb","schema_version":"cad.action-ledger.v1","sequence":42,"stage_id":"stage_7cd35c1437cb0bb42789"}
|
|
{"action_id":"act_041","at":"2026-09-01 01:03:31","candidate_id":"candidate_7cd35c1437cb0bb4","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"solid_count":1},"status":"pass"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.00000000000015,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"actual_count":1,"actual_through_count":0,"diameter_mm":12,"expected_count":3},"status":"fail"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore pattern is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_rejected","reason":"deterministic_claim_failed","schema_version":"cad.action-ledger.v1","sequence":43,"stage_id":"stage_7cd35c1437cb0bb42789","working_head":"cad_b74e9539b3f7:rev_001:v40"}
|
|
{"at":"2026-09-01 01:03:39","corrective_intent":"Revise the bore operation because the current candidate still reports only one non-through 12 mm bore; the action needs a true through-bore result that satisfies the deterministic claim.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_current_model","evidence_current_claims","evidence_ledger_43"],"root_cause":"The submitted candidate does not satisfy the required through-cylindrical-bore condition: the measured bore count is incomplete and the feature is not through, so the deterministic claim still fails.","schema_version":"cad.action-ledger.v1","sequence":44,"working_head":"cad_b74e9539b3f7:rev_001:v44","working_head_before":"cad_b74e9539b3f7:rev_001:v43"}
|
|
{"action_id":"act_045","at":"2026-09-01 01:03:49","atomic_id":"hole_wizard","contract_hash":"35d56dd42ee933e0fe59f9cfc33391b25844bd270a8909703af7855ad6bd25f2","event":"proposed","expected_change":"Introduce one 12 mm through bore at the next collinear center position in the existing single-solid link body, ensuring the cut fully penetrates the 10 mm thickness without splitting the part into multiple solids.","intent":"Repair the pending bore chain by creating a true through hole while preserving the one-solid invariant.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":45,"working_head":"cad_b74e9539b3f7:rev_001:v44"}
|
|
{"at":"2026-09-01 01:04:14","code":"RUNTIME_PRECONDITION_FAILED","event":"runtime_precondition_rejected","message":"RUNTIME_PRECONDITION_FAILED: hole position is outside the selected host-face bounds","schema_version":"cad.action-ledger.v1","sequence":46,"tool":"submit_cdsl_fragment"}
|
|
{"action_id":"act_047","at":"2026-09-01 01:04:25","atomic_id":"hole_wizard","contract_hash":"35d56dd42ee933e0fe59f9cfc33391b25844bd270a8909703af7855ad6bd25f2","event":"proposed","expected_change":"Place the 12 mm through bore center within the selected host-face bounds at the next collinear position so the cut can complete as a true through hole without violating host-face limits.","intent":"Repair the failed hole placement by reissuing the bore with an in-bounds center location while preserving the single-solid link body.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":47,"working_head":"cad_b74e9539b3f7:rev_001:v46"}
|
|
{"action_id":"act_047","at":"2026-09-01 01:05:27","candidate_id":"candidate_b8a38886f61fbe50","event":"candidate_building","fragment_hash":"98d600c9ed05cabc314f1324d0e17e7ac20695603a6c98c02a8acd996004e68b","schema_version":"cad.action-ledger.v1","sequence":48,"stage_id":"stage_b8a38886f61fbe50eedc"}
|
|
{"action_id":"act_047","at":"2026-09-01 01:05:28","candidate_id":"candidate_b8a38886f61fbe50","event":"candidate_build_failed","message":"CANDIDATE_BUILD_FAILED: float() argument must be a string or a real number, not 'NoneType'","schema_version":"cad.action-ledger.v1","sequence":49,"stage_id":"stage_b8a38886f61fbe50eedc","working_head":"cad_b74e9539b3f7:rev_001:v46"}
|
|
{"at":"2026-09-01 01:05:39","corrective_intent":"Restore the required bore position value as a real number and resubmit the fragment with the selector token so the hole placement can proceed.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_current_model","evidence_current_claims","evidence_ledger_49"],"root_cause":"Candidate build consumed a missing numeric field for the hole position, producing float(NoneType) before the fragment could be submitted.","schema_version":"cad.action-ledger.v1","sequence":50,"working_head":"cad_b74e9539b3f7:rev_001:v50","working_head_before":"cad_b74e9539b3f7:rev_001:v49"}
|
|
{"action_id":"act_051","at":"2026-09-01 01:05:47","atomic_id":"hole_wizard","contract_hash":"35d56dd42ee933e0fe59f9cfc33391b25844bd270a8909703af7855ad6bd25f2","event":"proposed","expected_change":"Introduce one 12 mm through bore at the next collinear center position with a valid numeric in-bounds host-face location so the cut can build successfully.","intent":"Recover from the missing bore-position value and continue building the three-hole chain on the current solid without changing the existing body count or thickness.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":51,"working_head":"cad_b74e9539b3f7:rev_001:v50"}
|
|
{"action_id":"act_051","at":"2026-09-01 01:07:12","candidate_id":"candidate_2f4b89170bae407c","event":"candidate_building","fragment_hash":"98d600c9ed05cabc314f1324d0e17e7ac20695603a6c98c02a8acd996004e68b","schema_version":"cad.action-ledger.v1","sequence":52,"stage_id":"stage_2f4b89170bae407c5309"}
|
|
{"action_id":"act_051","at":"2026-09-01 01:07:13","candidate_id":"candidate_2f4b89170bae407c","event":"candidate_build_failed","message":"CANDIDATE_BUILD_FAILED: float() argument must be a string or a real number, not 'NoneType'","schema_version":"cad.action-ledger.v1","sequence":53,"stage_id":"stage_2f4b89170bae407c5309","working_head":"cad_b74e9539b3f7:rev_001:v50"}
|
|
{"at":"2026-09-01 01:07:21","corrective_intent":"Resubmit the bore placement with a concrete numeric in-bounds position and the required selector token so the cut can be built successfully.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_current_model","evidence_current_claims","evidence_ledger_53"],"root_cause":"The candidate build still passed a missing hole-position value into float(), so the fragment failed before any geometry was added.","schema_version":"cad.action-ledger.v1","sequence":54,"working_head":"cad_b74e9539b3f7:rev_001:v54","working_head_before":"cad_b74e9539b3f7:rev_001:v53"}
|
|
{"action_id":"act_055","at":"2026-09-01 01:07:30","atomic_id":"hole_wizard","contract_hash":"35d56dd42ee933e0fe59f9cfc33391b25844bd270a8909703af7855ad6bd25f2","event":"proposed","expected_change":"Introduce one 12 mm through bore at the next collinear center position using a concrete in-bounds numeric host-face location so the cut can build successfully.","intent":"Recover from the missing bore-position value and continue building the three-hole chain on the current solid without changing the existing body count or thickness.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":55,"working_head":"cad_b74e9539b3f7:rev_001:v54"}
|
|
{"action_id":"act_055","at":"2026-09-01 01:08:29","candidate_id":"candidate_9973a428c084befd","event":"candidate_building","fragment_hash":"b2f848f94ee299c6c66e41f3b6df3ae04e7ec8a0ad0ea4630f50388fb52d90d3","schema_version":"cad.action-ledger.v1","sequence":56,"stage_id":"stage_9973a428c084befdf210"}
|
|
{"action_id":"act_055","at":"2026-09-01 01:08:30","candidate_id":"candidate_9973a428c084befd","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"actual":2,"expected":1},"status":"fail"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.00000000000015,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_rejected","reason":"deterministic_claim_failed","schema_version":"cad.action-ledger.v1","sequence":57,"stage_id":"stage_9973a428c084befdf210","working_head":"cad_b74e9539b3f7:rev_001:v54"}
|
|
{"at":"2026-09-01 01:08:49","corrective_intent":"Return to action selection and re-read the current topology and operation contract before attempting any new geometry action.","decision":"return_to_action_selection","event":"geometry_conclusion","evidence_refs":["evidence_current_state","evidence_current_model","evidence_current_claims","evidence_ledger_57"],"root_cause":"The current checkpoint cannot proceed because the last attempted path still targets a rollback-like recovery instead of reselecting an action, which is rejected by the state error.","schema_version":"cad.action-ledger.v1","sequence":58,"working_head":"cad_b74e9539b3f7:rev_001:v58","working_head_before":"cad_b74e9539b3f7:rev_001:v57"}
|
|
{"action_id":"act_059","at":"2026-09-01 01:09:01","atomic_id":"hole_wizard","contract_hash":"35d56dd42ee933e0fe59f9cfc33391b25844bd270a8909703af7855ad6bd25f2","event":"proposed","expected_change":"Introduce the first 12 mm through bore on the current solid at the leftmost hole center of the three-hole chain, using the in-bounds center implied by the 172 mm overall length so the feature can be chained with the remaining two bores.","intent":"Restart geometry repair with a concrete bore insertion that preserves the single-body 10 mm-thick part and moves the model toward the required collinear 60 mm and 80 mm spacing.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":59,"working_head":"cad_b74e9539b3f7:rev_001:v58"}
|
|
{"action_id":"act_059","at":"2026-09-01 01:09:38","candidate_id":"candidate_c132dc11e0e174af","event":"candidate_building","fragment_hash":"fee65ec292a9066dc8016f34019861a7e9ba12aff2a4baf29757b6655b1ade89","schema_version":"cad.action-ledger.v1","sequence":60,"stage_id":"stage_c132dc11e0e174af6ad8"}
|
|
{"action_id":"act_059","at":"2026-09-01 01:09:40","candidate_id":"candidate_c132dc11e0e174af","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"solid_count":1},"status":"pass"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target through-bore pattern is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore pattern is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_built","schema_version":"cad.action-ledger.v1","sequence":61}
|
|
{"action_id":"act_059","actual_atomic_id":"hole_wizard","at":"2026-09-01 01:09:53","candidate_id":"candidate_c132dc11e0e174af","coverage":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"solid_count":1},"status":"pass"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target through-bore pattern is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore pattern is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"accepted","fragment_hash":"fee65ec292a9066dc8016f34019861a7e9ba12aff2a4baf29757b6655b1ade89","parent_revision":"rev_001","review_path":"revisions/rev_002/candidate-review.json","revision_id":"rev_002","schema_version":"cad.action-ledger.v1","selector_snapshot_id":"cad_b74e9539b3f7/candidate_f75848e1ea229d67","sequence":62,"working_head_before":"cad_b74e9539b3f7:rev_001:v58"}
|
|
{"action_id":"act_063","at":"2026-09-01 01:10:04","atomic_id":"hole_wizard","contract_hash":"35d56dd42ee933e0fe59f9cfc33391b25844bd270a8909703af7855ad6bd25f2","event":"proposed","expected_change":"Add the second 12 mm through bore on the existing solid at the next collinear center, 60 mm from the current bore axis, while preserving the single 10 mm-thick body.","intent":"Advance the three-hole chain one verified step toward the required 60 mm and 80 mm center spacing without disturbing the existing bore or body count.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":63,"working_head":"cad_b74e9539b3f7:rev_002:v62"}
|
|
{"action_id":"act_063","at":"2026-09-01 01:10:29","candidate_id":"candidate_53f049a1d9561cc0","event":"candidate_building","fragment_hash":"2ff9e4d5cf5fced75d8ab558bf28ca466d28da6d93ec4f4d3c90083bb9530e7c","schema_version":"cad.action-ledger.v1","sequence":64,"stage_id":"stage_53f049a1d9561cc086a4"}
|
|
{"action_id":"act_063","at":"2026-09-01 01:10:30","candidate_id":"candidate_53f049a1d9561cc0","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"solid_count":1},"status":"pass"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target through-bore pattern is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore pattern is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_built","schema_version":"cad.action-ledger.v1","sequence":65}
|
|
{"action_id":"act_063","actual_atomic_id":"hole_wizard","at":"2026-09-01 01:10:48","candidate_id":"candidate_53f049a1d9561cc0","coverage":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"solid_count":1},"status":"pass"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"reason":"the target through-bore pattern is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"reason":"the target bore chain is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"reason":"the target bore pattern is incomplete at this checkpoint"},"status":"pending"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"accepted","fragment_hash":"2ff9e4d5cf5fced75d8ab558bf28ca466d28da6d93ec4f4d3c90083bb9530e7c","parent_revision":"rev_002","review_path":"revisions/rev_003/candidate-review.json","revision_id":"rev_003","schema_version":"cad.action-ledger.v1","selector_snapshot_id":"cad_b74e9539b3f7/candidate_c132dc11e0e174af","sequence":66,"working_head_before":"cad_b74e9539b3f7:rev_002:v62"}
|
|
{"action_id":"act_067","at":"2026-09-01 01:10:58","atomic_id":"hole_wizard","contract_hash":"35d56dd42ee933e0fe59f9cfc33391b25844bd270a8909703af7855ad6bd25f2","event":"proposed","expected_change":"Add the third 12 mm through bore on the existing solid, collinear with the first two bores and positioned 80 mm from the current second bore axis so the bore-center chain becomes 60 mm then 80 mm, while preserving the single 10 mm-thick body.","intent":"Complete the required three-hole collinear through-bore chain before introducing or verifying the outer 32 mm contour.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":67,"working_head":"cad_b74e9539b3f7:rev_003:v66"}
|
|
{"action_id":"act_067","at":"2026-09-01 01:11:24","candidate_id":"candidate_03152aba0477560b","event":"candidate_building","fragment_hash":"efe0d9ac74d1de4c083e478bafd77bcf7acd040d0a0c27d335d3de339c7a6996","schema_version":"cad.action-ledger.v1","sequence":68,"stage_id":"stage_03152aba0477560b118f"}
|
|
{"action_id":"act_067","at":"2026-09-01 01:11:25","candidate_id":"candidate_03152aba0477560b","claim_results":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"solid_count":1},"status":"pass"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"through_bores":["body:feature_004:face:22","body:feature_004:face:23","body:feature_004:face:24"]},"status":"pass"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"adjacent_distances_mm":[80.0,60.0],"centres_mm":[[140.0,0.0,0.0],[60.0,0.0,0.0],[0.0,0.0,0.0]],"expected_orientation":"reversed","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"matched_cylindrical_faces":["body:feature_004:face:22","body:feature_004:face:23","body:feature_004:face:24"]},"status":"pass"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"candidate_built","schema_version":"cad.action-ledger.v1","sequence":69}
|
|
{"action_id":"act_067","actual_atomic_id":"hole_wizard","at":"2026-09-01 01:11:49","candidate_id":"candidate_03152aba0477560b","coverage":[{"claim_id":"claim_001","claim_kind":"solid_count_equals","deterministic":true,"evidence":{"solid_count":1},"status":"pass"},{"claim_id":"claim_002","claim_kind":"bbox_rank_dimension_mm","deterministic":true,"evidence":{"actual_mm":10.0,"rank":"minimum","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_003","claim_kind":"through_cylindrical_bore","deterministic":true,"evidence":{"through_bores":["body:feature_004:face:22","body:feature_004:face:23","body:feature_004:face:24"]},"status":"pass"},{"claim_id":"claim_004","claim_kind":"collinear_through_bore_chain","deterministic":true,"evidence":{"adjacent_distances_mm":[80.0,60.0],"centres_mm":[[140.0,0.0,0.0],[60.0,0.0,0.0],[0.0,0.0,0.0]],"expected_orientation":"reversed","tolerance_mm":0.1},"status":"pass"},{"claim_id":"claim_005","claim_kind":"cylindrical_bore","deterministic":true,"evidence":{"matched_cylindrical_faces":["body:feature_004:face:22","body:feature_004:face:23","body:feature_004:face:24"]},"status":"pass"},{"claim_id":"claim_006","claim_kind":"outer_cylindrical_surface","deterministic":true,"evidence":{"reason":"the target external cylindrical surface has not been introduced at this checkpoint"},"status":"pending"},{"claim_id":"claim_007","claim_kind":"visual","deterministic":false,"evidence":{"reason":"requires independent visual review"},"status":"pending"}],"event":"accepted","fragment_hash":"efe0d9ac74d1de4c083e478bafd77bcf7acd040d0a0c27d335d3de339c7a6996","parent_revision":"rev_003","review_path":"revisions/rev_004/candidate-review.json","revision_id":"rev_004","schema_version":"cad.action-ledger.v1","selector_snapshot_id":"cad_b74e9539b3f7/candidate_53f049a1d9561cc0","sequence":70,"working_head_before":"cad_b74e9539b3f7:rev_003:v66"}
|
|
{"action_id":"act_071","at":"2026-09-01 01:12:00","atomic_id":"fillet","contract_hash":"db31dd9c749707cc9453fc248d7ca86ef4faaaf15376a40bd659c325b037c878","event":"proposed","expected_change":"Blend the exterior outline between the three 32 mm circular lobes so the perimeter transitions smoothly while keeping the existing 10 mm thickness and three 12 mm through bores unchanged.","intent":"Introduce the remaining outer cylindrical/smooth contour needed to satisfy the three-lobe mechanical link shape without disturbing the proven bore chain.","requirement_ids":["req_001"],"schema_version":"cad.action-ledger.v1","sequence":71,"working_head":"cad_b74e9539b3f7:rev_004:v70"}
|
|
{"at":"2026-09-01 01:12:14","author_calls":84,"code":"CALL_BUDGET_EXHAUSTED","event":"call_budget_exhausted","max_author_turns":84,"max_model_calls":116,"max_reviewer_turns":32,"message":"Configured model-call budget is exhausted; a user decision is required.","next_actor":"author","reviewer_calls":6,"schema_version":"cad.action-ledger.v1","sequence":72,"total_calls":90}
|